Campus News

Traffic control at Empire Grade Road from Aug. 13 to Aug. 31

As part of maintenance work on UC Santa Cruz sewer lines, the campus will have traffic control measures in place from Aug. 13 to Aug. 31, creating possible delays for motorists.

By

As part of maintenance work on sewer lines on the western side of campus, UC Santa Cruz will have traffic control measures in place, creating possible delays for motorists. The delays should be no more than 15 minutes.

The traffic control measures will be between Western and Heller drives on Empire Grade Road from 8:30 a.m.–4:30 p.m. on Aug. 13 until Aug. 31.

We appreciate your patience and understanding.

Related Topics

Last modified: Mar 18, 2025